A great affordable space for film, television, commercial and music video productions, with a laser-levelled floor and a 100t rigging load. It’s also acoustically sound, featuring an acoustic wall and ceiling panel system designed by Arup Acoustic Lab in conjunction with SRL, so it offers a high level of sound integrity.

Excellent A/V and IT connectivity between all the building spaces, and plenty of room for control room set-up, making a cost-effective yet professional environment for film and TV production.

See below for the Royal Opera House's Autumn Season film starring Royal Ballet dancers and the Minotaur which was filmed in the main space and the technical grid.